Skip to content
HTD Company
  • Home
  • Services
    • Acid resistant floor system
    • Garbage / Linen Shute System
    • Sandwich Panel
    • Expansion joints cover
    • Performance Louver
    • Entrance Mats & Grids
    • Gutter Drainage Channel & Floor Drain
    • Siphonic Roof Drainage System
  • Project
  • enEnglish
    • viVietnamese

Project

Heineken Myanmar Brewery

Acid Resistant Floor System

PROJECT INFORMATION

Project: Heineken Myanmar Brewery
Contractor: HTD
Product: Acid Resistant Floor System

PROJECT DETAIL

Project: Heineken Myanmar Brewery.

Location: Myanmar.

Branch: Beer.

Categories: Acid resistant floor, Acid tiling, Corrosion resistant.

Construction Volume: 370 m2.

Product: Argelith tiles 15mm.

Method of Construction: Constructed by specialized Vibration.

ADVANTAGES OF THE SYSTEM

  • High load bearing capacity, heavy duty flooring.
  • Prevent to penetrate and corrode concrete.
  • Anti-Slip R9-R12.

SIMILAR PROJECTS

Copyright © 2022 HTD Company | Powered by Vietnam Adspioneer